Seawater Lift Pumping Station in the Caspian Sea, Azerbaijan
Umid-2 & Babek-1 Development Project Background
Development of the Umid field has already started using the Umid-1 Facility, which currently exports ~1.5 MSm³/d via a pipeline to the Bulla facility. The Babek-1 field is currently a prospect. Future development of these two fields will be based on a new Umid-2 facility, which could include limited pre-investment for the Umid-3 and Babek-1 facilities. A map showing the field location is provided below shows the Onshore and Offshore Facilities.